<div>On Wednesday, March 5th, 2025, between approximately 2am and 7am, CIT Network Engineering will be migrating buildings on the Morrison node router to new hardware. This is part of a project to upgrade network capacity and allow for growth across the campus network. During this window, buildings connected to the Morrison node will experience sporadic interrupted network access. <br><br>Buildings that are connected to the Morrison Node router include: <br>1064:Morrison Hall <br>1041:Stocking <br>1042:Wing Hall <br>1062:Riley Robb <br>1076:Boyce Thompson <br>1084:Lg Animal Re. <br>1047:CALS Surge <br>5160:Chill Water #2 <br>2725:Fed. Nut. Lab <br>1033:Surge 1 (Beebe) <br>2506:Plantation Head <br>2598:Plantation Serve <br>1045:Post Lab <br>1061:Insectory <br>1043:Livestock Pavilion <br>1060:Dimock Lab <br>5210:Filter Plant <br>1037:Atkinson Construction Switch</div>